Consortium of EGEM s.r.o. and SAG Elektrovod a.s.
400 kV line V 452
Basic information
Line length: 33.3 km
Earthing cable with optical
fibres / Earthing cable: 33.3 km
No. of masts: 99
Steel structure material: 2181 t
Paint material: 842 m2
Concrete foundations: 1,490 m3
Realization
Activities:
Upgrading of steel mast structures,
replacement of phase conductors, replacement of earthing cables and re-insulation